What can be adapted to a specific system, at which level, and under which rules, so that results stay reproducible and comparable.
ISVF is meant to be adapted. Industrial control systems differ too much for one fixed instrument: an item set and weighting tailored to gas production may not fit the automotive sector. The evaluation therefore has two stages. A system-specific stage holds the measurements and their preprocessors, and a generic stage, the processor, is the same for every system (see The evaluation model). Everything in the system-specific stage can be customized, but every change is part of the configuration and is governed.
What a configuration contains
A configuration is everything that determines the results apart from the answers themselves. Every report states the identifier of its configuration.
| Element | What it holds | Set during |
|---|---|---|
| Decomposition | The components, their boundaries, and the devices that implement them | Deployment: component definition |
| Measurement profile | The selected and added checklist items, the relevance values with their justifications, and the profile parameters | Deployment: profile definition |
| Weight matrix | How strongly each item counts towards each indicator | Deployment: weight tuning |
| Measurement weights | The assumed reliability of each measurement, if several are used | Deployment: weight tuning |
| Evaluation code | The preprocessors and the aggregation operator | Fixed by the version used |
The raw answers are not part of the configuration. They are stored separately and never overwritten, so that every execution can be re-evaluated under any configuration for which the required answers exist.
The published reference configuration consists of the Reference Checklist, the Reference Weight Matrix, the checklist-based preprocessor and the weighted-mean aggregation with . A site configuration starts from a specific version of it.
Three levels of customization
Customization takes place at three levels, in increasing order of effort. Start at the first level and go further only where there is a reason.
Level 1: Relevance only
The reference checklist and weights are used unchanged; only the relevance of each item is set for each component. Items that cannot apply to a component, such as operating system items for a solenoid valve, are excluded from the normalization, so the component is not penalized for lacking them.
- Relevance is set by the assessors, not by the assessed party, before answers are collected.
- Each decision is recorded with a short justification.
- Whole categories can be marked not relevant in one step, for example category 7 for a PLC that has no operating system the operator can administer.
- "Not relevant" means that the requirement cannot apply to the component. A missing control is a "no", never a reason to mark the item not relevant (see Answering the checklist).
TIP
This level is enough for most first assessments.
Level 2: Context-specific items
The checklist is extended with items that cover properties specific to the environment, for example a process-specific interlock or a protocol used only at the site. Whether such extensions improve accuracy has not been examined, so add items only where the reference checklist demonstrably leaves a gap.
A new item must:
- pass the gate: it directly affects the OT environment, or directly authorizes or governs changes to it (The scope criterion);
- be outcome-oriented: it states what must hold, not how it is achieved;
- have the right polarity: a "yes" always denotes the desired state;
- be verifiable at the time of the assessment, by a technical check, a document or an interview with the person responsible;
- come with a row of weights, assigned with the same procedure as the reference weights, and a rationale for every nonzero entry;
- not duplicate a property already covered by a reference item. If it refines one, consider whether the two should share their weight (see Level 3).
INFO
Items may also be removed from the checklist, for example where a whole area is out of scope for the site. Removing an item is different from marking it not relevant: it changes the instrument for every component, and it is recorded as a change to the profile.
Level 3: Tuning the weights
Experts within the organization adjust the weights and, if several measurements are used, the measurement weights . This is the most powerful level and the easiest to misuse, so every weight change needs a rationale expressed in terms of the attacker capability that the indicator describes.
The reference weights were assigned as follows, and site weights should be assigned the same way: assume that the component does not satisfy the item, and estimate for each indicator how much the unmet requirement would help an attacker gain or use that capability.
Points to watch:
- Binary or graded. The reference weights are 0 or 1. Graded weights in are allowed and let more important items count more within an indicator. They also make the ranking of unmet items more informative, because with binary weights all unmet items of an indicator contribute equally.
- Overrepresented topics. A topic covered by many items, such as cabling, can dominate an indicator, so that a component scores high on the strength of a single aspect. Balance the number of items per topic, or reduce the weights of the overrepresented items. The coverage table shows where this may occur.
- Split properties. If one property is deliberately split into several items, for example to distinguish maturity levels, each item adds its own weight to the same column. Unless the weights are reduced accordingly, that property counts more than a property represented by a single item.
- Normalization effects. Weights are normalized per component and per indicator. Changing one weight changes the effective weight of every other relevant item in the same column, for every component.
- Measurement weights. expresses how reliable the assessors consider measurement as a source of evidence. It does not express coverage, which is captured by the applicability matrices, or the importance of the assessed properties, which is captured by the weights within each measurement. For example, states that an automated time series measurement is considered more reliable than an operator security test. Only the ratios matter; the effective weights are renormalized for every component-indicator pair and should be reported with the results.
INFO
A structured procedure for assigning weights, such as pairwise comparison with a consistency check, is planned but not yet part of the method.
Profile parameters
Several reference items refer to values that the site records in the measurement profile, such as a detection time or a retention period. They are set during Deployment, before answers are collected, and versioned with the profile. Changing a parameter changes what a "yes" means, so it is a change to the configuration.
| Parameter | Used by items |
|---|---|
| Inspection interval for traces of physical intervention | 1.3 |
| Maximum detection time for an event (physical presence, structural damage, connection fault, failed delivery, unauthorized command, critical security event, silent log source) | 1.4, 2.4, 3.3, 5.5, 6.6, 14.7, 14.8 |
| Retention period for access evidence and logs | 1.5, 14.4 |
| Documented types of tolerated structural damage and the time to be bridged | 2.3 |
| List of connections critical for availability | 3.6 |
| Data classification that determines where encryption is required | 5.1, 7.33 |
| Inactivity period after which an account is disabled | 7.15 |
| Update frequency of malware protection | 7.29 |
| Patch deadline per risk class | 11.3 |
WARNING
Choose the values from the operational constraints of the site, not from the expected answers. A value that is so lenient that every component satisfies the item makes the item meaningless.
Extending the method
Beyond the three levels, the evaluation model itself can be extended. These options change the evaluation code, which is part of the configuration, and they are governed like any other change. In the reference implementation, only the checklist-based measurement is used.
- Finer response scales. Instead of 0 and 1, responses may use a graded scale mapped into , for example for partial fulfillment. The mapping must be defined in advance.
- Additional measurements. Other sources of evidence, such as document analysis, time series analysis or structured penetration-test results, can be added through their own preprocessors. The only requirement is that a preprocessor produces a component-indicator matrix with values in and a matching applicability matrix. A measurement that says nothing about a component-indicator pair marks it as not applicable; it never imputes a value.
- Other aggregation operators. The weighted mean can be replaced, for example by an indicator-specific weight matrix instead of the single vector , or by a nonlinear operator such as one based on fuzzy logic, provided that it maps into and respects the applicability masks.
- Additional indicators. Organizations may define further indicators, provided that the corresponding measurement techniques and evaluation procedures are specified and documented. Each new indicator needs a column in with a rationale for every entry.
- Relevance handled by the items. If the items of a measurement already handle relevance themselves, the relevance vectors may be omitted, which is equivalent to treating every item as relevant.
Such extensions do not make ISVF an audit tool, but its results may help define the scope and priorities of a subsequent audit.
Governing changes
Because the weights and the relevance decisions rest on judgment, changing them could turn an unfavorable result into a favorable one. Changes are therefore governed, to keep the results reproducible and interpretable.
Two layers
- The reference configuration is published and is the common starting point.
- A site configuration records the deviations from a specific reference version. It stays private to the site; site data are never stored in the public repository.
A site-level change is taken over into the reference configuration only if it corrects a defect or has a technical justification that does not depend on the site.
A priori and a posteriori changes
ISVF distinguishes changes made before and after the results are known. A priori changes are the default. A posteriori changes are permitted, but only for the reasons listed below.
| A priori | A posteriori | |
|---|---|---|
| When | Before answers are collected for the execution | After results have been seen |
| Basis | Process, architecture, threat context, operational constraints | Documented defect or new technical evidence |
| Permitted reasons | Context-specific relevance, items and weights | Incorrect entry, mapping or relevance decision; ambiguous item; disproved weight rationale; overrepresented property |
| Not sufficient | Desired or expected score | Disagreement with a result; request of the assessed party; desired score |
| Scope | Site configuration | All components in the configuration, never a single component |
| Effect on results | Results are reported under the frozen configuration | The original report is kept; old and new results are reported side by side |
| Review | Rationale recorded before collection | Reviewer not involved in the assessment |
Relevance is the most sensitive lever
DANGER
Under relevance compensation, an unsatisfied item that is reclassified as not relevant leaves both the numerator and the denominator. The indicator can only stay the same or rise, while reclassifying a satisfied item can never raise it. A respondent seeking a higher score therefore gains only by marking unsatisfied items as not relevant, and respondents in the exploratory applications did exactly that. This is an instance of Goodhart's law: when a measure becomes a target, it ceases to be a good measure.
For this reason:
- relevance is fixed by the assessors, with a justification, before answers are collected;
- a relevance decision changed after the results have been seen is an a posteriori change and goes through the same review;
- the number of items marked not relevant is reported for each component next to the heatmap, so that unusual patterns are visible.
Handling disagreement
A result that contradicts expectations may be exactly what the assessment should reveal, so disagreement alone does not justify a change. Check the answer, the relevance decision and the decomposition first. A weight is changed only if its rationale, expressed in terms of the attacker capability that the indicator describes, is shown to be wrong. Otherwise the result stands, and the disagreement is recorded as a finding. The Tutorial walks through an example.
Versioning
The items, the weights, the indicator mapping and the evaluation code are kept under version control. Earlier versions are never overwritten, and each published version is tagged and archived with a persistent identifier. Versions follow a three-part scheme:
| Part | Changes when | Examples |
|---|---|---|
| Major | The indicator set or the meaning of an item changes | Adding or removing an indicator, rewording an item so that a different state counts as "yes" |
| Minor | Item membership or numerical weights change | Adding or removing an item, changing a weight |
| Patch | Nothing changes numerically | Fixing a typo, clarifying a description without changing its meaning |
Change record
Every change is recorded with:
- identifier, date and scope (reference or site configuration);
- the affected item and indicator, with the old and new values;
- the mode (a priori or a posteriori) and the reason;
- whether results had been seen;
- the proposer and the reviewer;
- the impact. For a posteriori changes, this comprises the largest absolute change in any indicator value, the number of component-indicator pairs that changed by more than a threshold fixed in advance, and any change in the component ranking.
Comparability after a change
- Results are compared only under the same configuration. After a change, the retained answers are re-evaluated under the new configuration.
- Answers to newly added items are never imputed for past executions. Comparisons across versions use only the items common to both, and the restriction is reported.
- If the decomposition changes, only components whose boundaries stayed the same are compared.
- Reproducibility is not validity. Data used for a posteriori tuning cannot also serve as evidence that the instrument is valid, because the instrument has already been fitted to them.
Reviewing the instrument after the first executions
At the start, it is worth reviewing the experience after a fixed number of executions, chosen in advance. Check whether
- the items can be understood unambiguously,
- the relevance decisions can be made consistently for components of the same type,
- the checklist covers the security properties of the assessed components, and
- some items turned out to matter more or less than their weights assume.
The review may lead to clarifying, adding or removing items and to adjusting weights. Because the results are already known at this point, these are a posteriori changes and follow the rules above: documented reasons, an independent reviewer, application to all components, and old and new results reported side by side.
What-if analysis is not a configuration change
To estimate the effect of planned measures, copy the recorded answers of a baseline execution, change the copy as if the measures had already been implemented, and evaluate it under the same configuration. The original answers stay unchanged. Comparing scenarios for single measures or combinations of them helps prioritize remediation before implementation.
WARNING
A what-if analysis simulates changes in the indicators, not changes in the actual security of the system. It must never be used to argue for changing weights or relevance.
Recommended procedure for a site configuration
- Record the reference version you start from.
- Decompose the system and document the reasoning behind every boundary.
- Set the relevance values for every component and item, with justifications, before any answers are collected.
- Fix the profile parameters.
- Add context-specific items only where the reference checklist leaves a gap, each with a weight row and a rationale.
- Leave the weights unchanged unless there is a documented technical reason; record every deviation.
- Freeze the configuration, assign it an identifier, and only then collect answers.
- Report every result with its configuration identifier, the number of items marked not relevant per component and, after any a posteriori change, the old and new results side by side.